EPCOR (Gold Bar Wastewater Treatment Plant)
Edmonton, AB
Thoroughly investigated management of change requests (MOCs) issues using root cause analysis to carefully define the problem statement.
Evaluated risk reduction, safety of implementation, cost and technical feasibility for each solution alternative and presented recommendations to a large audience (~100 people).
Designed all solutions with the end user in mind by consulting technicians responsible for installing and operating equipment.
Reviewed Piping and Instrumentation Diagrams (PIDs) to ensure that they are correctly represented as built.
Conveyed complicated project work scopes in clear work packages using annotated photos.
Wrote Engineering Reports to address problems and present corresponding solutions along with risk and economic analysis as well as technical recommendations.
Factory Climbing
Edmonton, AB
Coach classes of 6-12 people, ranging from 4-6-year-olds to adult programs
Demonstrate safe practices and technical climbing skills to limit liability and achieve the client’s goals
Create, modify, and execute lesson plans to target the development of athletes’ weaknesses while being engaging
Coordinate with other coaches to arrange space usage scheduling
Help correct technique while climbers are on the wall and create drills to help them through movements if they are struggling
Brief classes and drop-ins on the inherent risk while climbing and measures taken to mitigate them
TRIUMF: Canada's Particle Accelerator Centre
Vancouver, BC
Modeled and mated parts in large complex assemblies while keeping files organized.
Worked proficiently in both ISO and ASME drawing standards to maintain accuracy and consistency with European contributor (CERN - Conseil Européen pour la Recherche Nucléaire).
Maintained high attention to detail to ensure an exact match between our models and the models and drawings shared with us by CERN.
Independently completed complex engineering drawings for manufacturing using GD&T (Geometric Dimensioning & Tolerancing).
Tracked all inconsistencies in the models & drawings and reported them in a concise written document to ensure clarity of scope.
Presented weekly to share progress and points of concern with the team.
Designed and researched conceptual solutions to problems encountered.
Project Link: CERN Cryomodule
TRIUMF: Canada's Particle Accelerator Centre
Vancouver, BC
Carried out structural FEA with ANSYS static-structural and verified them with written calculations to maintain minimal deformation under normal and seismic loading.
Worked closely with a senior engineer mentor to design new solutions and model them in SolidWorks.
Designed to ensure longevity in a high radiation vacuum environment.
Wrote engineering reports communicating design choices, analysis results and resulting recommendations.
Created engineering drawings using GD&T according to ASME standards.
Prototyped and iterated parts using 3D printing to rapidly trial fits and design functionality.
Consulted with onsite machine shop to ensure simple and affordable design solutions wherever possible.
Project Link: Target Pit Structural Analysis
Midwest Pipelines
Edson, AB
Evaluated and recorded risks for each activity to ensure adequate safety measures were taken and safe working requirements were met
Inspected the pipeline coating for any chips or weak points to minimize corrosion and guarantee environmental safety of the pipeline
Presented safety information at the beginning of every day to keep the workers focused on safety
St. Albert Nordic
St. Albert, AB
Coached groups of 5-15 skiers ranging in age from three to ten, teaching them all the basic movements of Nordic skiing without poles
Build, and execute lesson plans to teach all required skills for the level in eight weeks, while maintaining a fun and engaging style of teaching to keep the attention of kids
Adapt to changing environmental conditions to ensure safety and a good teaching environment for each specific skill
Modify lesson plans throughout a season to accommodate wide range of skill levels present in a group
Carefully manage what changes must be made to a lesson plan based on the conditions such as changing location in high winds and staying close if its very cold
Campers Village (now Breathe Outdoors)
Edmonton, AB
Worked as a team member to educate the public on outdoor sports equipment
Built relationships with customers and worked as a team to help benefit the customers
Broke down technical knowledge to be clear for everyone to understand
Evaluated the needs of customers without needing them to directly present it